About
Menzel Lejmat North Field, Algeria
Operator: ConocoPhillips (65.0%)
Co-venturer: Talisman (35.0%)
Discovered in 1996, the field began producing in 2003. The MLN expansion project was completed in 2008. [1]
Menzel Lejmat North Field, Algeria
Operator: ConocoPhillips (65.0%)
Co-venturer: Talisman (35.0%)
Discovered in 1996, the field began producing in 2003. The MLN expansion project was completed in 2008. [1]
This work by Piping-Designer, LLC is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Unported License.