About
South Jambi Field, Indonesia
Operator: ConocoPhillips (45.0%)
Co-venturers: PetroChina International Jambi ‘B’ Ltd. (30.0%), PT. Pertamina Hulu Energi South Jambi ‘B’ (25.0%)
The South Jambi ‘B’ PSC is located in South Sumatra and covers a contract area of 594 square miles. The PSC was awarded in 1990 and will expire in 2020. Net production in 2008 was 4 MMCFD of natural gas. [1]
