Run Time
Run Time Formula |
| \( RT \;=\; \dfrac{ PPT }{ ST } \) |
| Symbol |
| \( RT \) = run time |
| \( PPT \) = planning production time |
| \( ST \) = stop time (manufactures process time, but with no planned or unplanned stops) |
Run time, abbreviated as RT, is the scheduled production time and its running.
